- Me:
- possible locations: 5th November 2010
- risk assessment sheet: 5th November 2010
- shooting schedule: 10th November 2010
- mock up of film poster: 26th November 2010
- magazine font test: 30th November 2010
- gun convention: 30th November 2010
- Sophie:
- call sheet: 10th November 2010
- in charge of contacting Warwickshire police about filming with toy gun: 16th November 2010
- mock up of film poster: 26th November 2010
- Ellie:
- prop and budget list: 4th November 2010
- storyboard: 5th November 2010
- script written up: 5th November 2010
- shot list: 10th November 2010
- location recce: 17th November 2010
- font test: 12th November 2010
- mock up of film poster: 26th November 2010
- Tim:
- finalised music for trailer (cut and edited): 15th November 2010
- putting trailer structure together on final cut pro: 15th November 2010
- storyboard images (basic structure)
- Group:
- possible cast: 1st November 2010
- selected locations:
- costume design ideas: 1st November 2010
- final cut pro: 16th November 2010
- storyboard structure and music
- script brainstorming: 1st November 2010
- filming: 17th December 2010
No comments:
Post a Comment